Final Design Details
Following picture shows the Final Round Soil Column setup and results. Based on the consistent infiltration results and LID Design Code consideration, unit 2 and 6 are suggested as the final designs.
Following table shows the infiltration rate results and void storage capacity of the final designs.
After the infiltration and void tests, the water quality tests were repeated, and following tables shows the water quality tests results.
This is the materials cost breakdown.
This is the estimated materials cost for final designs for a 500 square ft pound basin.